Akashi Data Center
Akashi Data Center: “Akashi — Central Asia's first Tier IV data center. 4,224 racks, 100 MW, 99.995% uptime, AI/ML-ready colocation in Astana, Kazakhstan.”
What colocation options do you offer?
“From a single rack to a turnkey private suite or cage — depending on your business needs.”
在公司资料中查看Which telecom operators and ISPs are available?
“We collaborate with multiple providers. Specific connectivity options are discussed individually based on client requirements.”
在公司资料中查看Is 24/7 support available?
“Yes. Remote hands are available 24/7 for technical operations and on-site assistance.”
在公司资料中查看Can high-load AI/ML systems be hosted?
“Yes. Our infrastructure supports AI/ML workloads, including deployments on NVIDIA-based HPC. High-density rack requests are reviewed case-by-case.”
在公司资料中查看Do you bypass sanctions?
“No. We work exclusively with companies not subject to international sanctions. Sanction circumvention is strictly prohibited.”
在公司资料中查看When does Akashi go live?
“The first phase is scheduled to launch in May 2027, with pipeline already 107% filled pre-launch (5.54 MW reserved against DC-1 capacity).”
在公司资料中查看Does TCDD mean the facility is already Tier IV certified?
“No. TCDD (Tier Certification of Design Documents) certifies the design, not the built hall. TCCF (Tier Certification of Constructed Facility) is the on-site audit of the constructed facility, planned for April 2027. TCDD is not TCCF.”
在公司资料中查看
这份来源的其他资料
- Akashi Data Center
“Akashi — Central Asia's first Tier IV data center. 4,224 racks, 100 MW, 99.995% uptime, AI/ML-ready colocation in Astana, Kazakhstan.”