{"schemaVersion":"ready-scan.discovery-surface.v1","id":"urn:readyscan:corpus:buyer-question:shenzhen-far-east-oil-drilling-engineering-q141180459-answer-b1f27a2afa88e7e34c99","key":"buyer_question:shenzhen-far-east-oil-drilling-engineering-q141180459-answer-b1f27a2afa88e7e34c99","kind":"buyer_question","slug":"shenzhen-far-east-oil-drilling-engineering-q141180459-answer-b1f27a2afa88e7e34c99","canonicalUrl":"https://readyscan.ai/corpus/buyer-question/shenzhen-far-east-oil-drilling-engineering-q141180459-answer-b1f27a2afa88e7e34c99","machineUrl":"https://readyscan.ai/discovery/corpus/buyer-question/shenzhen-far-east-oil-drilling-engineering-q141180459-answer-b1f27a2afa88e7e34c99.json","datePublished":"2026-10-22","dateModified":"2026-10-22","materialFingerprint":"fnv1a64:219b2a91ac5e76c4","membershipFingerprint":"fnv1a64:596e6f8dbe308754","relatedEntitySlugs":["shenzhen-far-east-oil-drilling-engineering-q141180459"],"relatedSurfaceKeys":["buyer_question:shenzhen-far-east-oil-drilling-engineering-q141180459-answer-4127c5027a21117b1a7d","buyer_question:shenzhen-far-east-oil-drilling-engineering-q141180459-answer-83b2592d83af1d7d1934","buyer_question:shenzhen-far-east-oil-drilling-engineering-q141180459-answer-ada4ca7fcb6bea1d2250","buyer_question:shenzhen-far-east-oil-drilling-engineering-q141180459-answer-d3fb240cb76831a0022e","buyer_question:shenzhen-far-east-oil-drilling-engineering-q141180459-answer-e0bfbaea1b4c5cc18fb4","buyer_question:shenzhen-far-east-oil-drilling-engineering-q141180459-answer-f10269debfb8426739c6","evidence:shenzhen-far-east-oil-drilling-engineering-q141180459","relationship:shenzhen-far-east-oil-drilling-engineering-q141180459-products-and-services"],"sourceIds":["ready-scan-subjects"],"provenance":[{"snapshotId":"shenzhen-far-east-oil-drilling-engineering-q141180459-content-6f771b30d083f63a-snapshot","sourceId":"ready-scan-subjects","sourceRecordId":"Q141180459","sourceRevisionId":"Q141180459:content:7792da25c5a5e98c","sourceContentHash":"fnv1a64:ad98bc3765d7e414","recordRevisionId":"Q141180459:content:7792da25c5a5e98c","recordContentHash":"fnv1a64:535d70830a70ade6","sourceCanonicalUrl":"https://www.feode.com/","sourceModifiedAt":"2026-10-22T15:50:25.290Z","observedOn":"2026-10-22","permission":{"basis":"public_information","evidenceUrl":"https://www.feode.com/"},"attributionUrl":"https://www.feode.com/"}],"quality":{"method":"same_kind_unique_trigram_floor","minimumUniqueTrigramRatio":0.3,"status":"passed"},"title":"How much rig time does FEODE's one-trip abandonment tool save?","summary":"Cited source answers across 1 active corpus record.","question":"How much rig time does FEODE's one-trip abandonment tool save?","answers":[{"entitySlug":"shenzhen-far-east-oil-drilling-engineering-q141180459","entityName":"Shenzhen Far East Oil Drilling Engineering","answer":"“FEODE's outside-suspension well abandonment tool cuts and recovers casing and conductor in a single run, saving about 15-20 hours of rig time per well, roughly US$400,000-500,000.”","sourceUrls":["https://www.feode.com/faq"]}]}